For many image requests, a matching image can already be located in the archives of high-resolution KOMPSAT imagery from around the world. If no image data is available in the archives, new KOMPSAT satellite image data can be acquired through a satellite new tasking process.
Search and order process shall be handled by the sales partner. For product pricing and availability for all KOMPSAT series,
please contact us by email at sales@geontek.co.id
The minimum order size of the new tasking order is 100 km² for KOMPSAT-2, KOMPSAT-3 and KOMPSAT-3A. Minimum swath of AOI should be greater than 5 km.
The off-nadir viewing angle (combining the pitch and roll angles) at which an image is collected will have impact on the GSD, the look of the image, and the chance of imaging (re-visit time) as well as delivery schedule. The off-nadir viewing angle has no impact on price.
All imagery products acquired by the new tasking order will contain less than equal to 20% cloud cover unless cloud cover condition is specified in the order form. Certain amount of uplifts will be applied to the price for the cloud cover <=10%.
KOMPSAT image products are delivered on DVD or electronically
via FTP.
1R and 1G are available
Bundle (PAN + MS) or Pan-sharpened are available
AOI needs to be specified in the order form as one of following method.
New tasking option | Priority | Description | Nominal collection window |
---|---|---|---|
Priority plus | Very high | Emergency : Tasking is guaranteed within 4days from the order if feasible. No feasibility study report is provided and no guarantee for tasking, cloud cover and/or tilt angle constraint. Assured : After feasibility study, the tasking on specified date has highest priority among commercial orders. No guarantee for cloud cover. |
4 days or specific date |
Priority | Higher | Feasibility proposal is provided. if acquisition is not completed during the collection window, user changed its priority to Standard or update collection window to continue acquisition |
4 weeks |
Standard | Standard | Feasibility proposal is provided if acquisition is not completed with maximum number (10) of acquisitions during the collection window, one image among collections must be purchased. |
12 weeks or more |
HH, HV, VH, VV
L1A, L1C, L1D
Integer
HDF, Geo TIFF
AOI needs to be specified in the order form as one of following method.
New tasking priority provides two options designed to meet a variety of customer needs. These options consider that balances the cost against the need for timeliness, level of risk, and control over the collection window.
Priority | Description | |
---|---|---|
Priority | Higher | Feasibility proposal is provided. if acquisition is not completed during the collection window, user changed its priority to Standard or update collection window to continue acquisition |
Standard | Standard | Feasibility proposal is provided if acquisition is not completed with maximum number (10) of acquisitions during the collection window, one image among collections must be purchased. |